Tag: Information Systems Case Studies & Problem Sets

  • [Solved] Research

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    Answer each part separately and in order **files (1)** – ## CSIS340Instructions.docx **## CSIS340Instructions.docx** The student must submit a Paragraph of at least 250 words. Two or more peer-reviewed articles must be cited to support your position and argument for your post, and two or more Biblic…

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    Answer each part separately and in order

    **files (1)**

    – ## CSIS340Instructions.docx

    **## CSIS340Instructions.docx**

    The student must submit a Paragraph of at least 250 words. Two or more peer-reviewed articles must be cited to support your position and argument for your post, and two or more Biblical verses are cited reflecting the Biblical views on the Discussion prompt. All citations must have an accompanying reference in the APA reference section at the end of the post. Complete paragraphs must be used, proper APA formatting, and cite information that is not his/her own.

    I)
    **Security Policy Design and Organization**

    Describe the fundamental security policies outlined by PCI DSS, FISMA, and COBIT. In a subsequent paragraph, identify at least 2 types of industries (e.g., Internet service providers, health care, education) and describe which of the latter standard(s) should be considered in that industry. Defend your response.

    II)
    **Security Policy Maintenance**

    Discuss the importance of installing an application-based firewall on a personal workstation. In one paragraph, describe the name and version of a potential firewall and its core features. In a second paragraph, describe any risks or threats mitigated by using this firewall.

    III)
    **Risk Management**

    Discuss the importance of installing an application-based security scanner on a personal workstation. In one paragraph, describe the name and version of a potential security scanner and its core features. In a second paragraph, describe any risks or threats mitigated by using this security scanner. Be sure to include how current advances in artificial intelligence and machine learning aid in the detection process of malicious software.

    IV)
    **IT Security Policy Systems**

    The United States Government Configuration Baseline (USGCB) evolved from the Federal Desktop Core Configuration mandate and is a government-wide initiative to maintain and properly update security settings. Research and summarize at least 2 recent security patches that relate to your current operating system. In a separate paragraph, do you feel these security patches help secure your computer? Why? Defend your response.

    https://csrc.nist.gov/Projects/United-States-Government-Configuration-Baseline

    **## CSIS340Instructions.docx**

    The student must submit a Paragraph of at least 250 words. Two or more peer-reviewed articles must be cited to support your position and argument for your post, and two or more Biblical verses are cited reflecting the Biblical views on the Discussion prompt. All citations must have an accompanying reference in the APA reference section at the end of the post. Complete paragraphs must be used, proper APA formatting, and cite information that is not his/her own.

    I)
    **Security Policy Design and Organization**

    Describe the fundamental security policies outlined by PCI DSS, FISMA, and COBIT. In a subsequent paragraph, identify at least 2 types of industries (e.g., Internet service providers, health care, education) and describe which of the latter standard(s) should be considered in that industry. Defend your response.

    II)
    **Security Policy Maintenance**

    Discuss the importance of installing an application-based firewall on a personal workstation. In one paragraph, describe the name and version of a potential firewall and its core features. In a second paragraph, describe any risks or threats mitigated by using this firewall.

    III)
    **Risk Management**

    Discuss the importance of installing an application-based security scanner on a personal workstation. In one paragraph, describe the name and version of a potential security scanner and its core features. In a second paragraph, describe any risks or threats mitigated by using this security scanner. Be sure to include how current advances in artificial intelligence and machine learning aid in the detection process of malicious software.

    IV)
    **IT Security Policy Systems**

    The United States Government Configuration Baseline (USGCB) evolved from the Federal Desktop Core Configuration mandate and is a government-wide initiative to maintain and properly update security settings. Research and summarize at least 2 recent security patches that relate to your current operating system. In a separate paragraph, do you feel these security patches help secure your computer? Why? Defend your response.

    https://csrc.nist.gov/Projects/United-States-Government-Configuration-Baseline

  • [Solved] Operating Systems and Real-World System Management

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    **files (2)** – ## OperatingSystemsandReal-WorldSystemManagement.docx – A220-1202Module11.pptx **## OperatingSystemsandReal-WorldSystemManagement.docx** Write a 2–4 page paper that addresses all of the sections below. Your paper should be written in third person, follow APA formatting, and include b…

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    **files (2)**

    – ## OperatingSystemsandReal-WorldSystemManagement.docx

    – A220-1202Module11.pptx

    **## OperatingSystemsandReal-WorldSystemManagement.docx**

    Write a 2–4 page paper that addresses all of the sections below. Your paper should be written in third person, follow APA formatting, and include both course concepts and personal observations from labs or real-world experiences (work, school, or personal technology use).

    Avoid bullet-point answers or copying language from the labs, textbook, or PowerPoint slides. Papers that rely heavily on definitions or generic explanations will not meet expectations.

    Required Discussion Areas

    1. Operating Systems and Hardware Interaction

    · Explain how operating systems interact with hardware and system components. Discuss the operating system you are most familiar with and how it manages system performance or resources. Describe observations from labs or personal device use related to startup behavior, responsiveness, or hardware management.

    2. Filesystems, Installation, and Operating System Choices

    · Reflect on your experience installing, upgrading, or observing an operating system during labs or on a personal device.

    · Discuss how choosing an inappropriate operating system or edition could create challenges in a home or business environment.

    3. Windows Configuration and Local Network Management

    · Discuss Windows settings or configurations that stood out to you as important, confusing, or useful.

    · Explain how local network configuration affects device connectivity and user productivity.

    · Reflect on how your confidence with basic troubleshooting or configuration has changed since completing the labs.

    4. User Accounts, Domains, and Access Control

    · Reflect on environments you have seen where user accounts are managed (school, workplace, lab environment).

    · Explain why organizations might choose centralized user management instead of local accounts.

    · Discuss how improper account management could affect security, access, or efficiency.

    5. Cross-Platform Skills

    · Explain why IT professionals benefit from being comfortable with more than one operating system.

    Conclusion

    · Summarize how your understanding of operating systems and system management has developed over the course.

    · Identify skills or concepts you feel most prepared to apply in a real IT support role.

    · Reflect on how the labs contributed to your learning beyond reading or lectures.

    Sources and Citations

    · Include a minimum of three credible sources

    · Course materials may be used, but outside sources are encouraged. All sources must be cited using APA 7th edition in-text citations and listed on a References page

    APA Formatting Requirements

    · APA title page

    · 12-point Times New Roman font

    · Double-spaced

    · 1-inch margins

    · Page numbers

    · Proper in-text citations and references

    **A220-1202Module11.pptx**

    This file is too large to display. [View in new window](https://www.sweetstudy.com/files/a220-1202module11-pptx)

    **A220-1202Module11.pptx**

    This file is too large to display. [View in new window](https://www.sweetstudy.com/files/a220-1202module11-pptx)

    **## OperatingSystemsandReal-WorldSystemManagement.docx**

    Write a 2–4 page paper that addresses all of the sections below. Your paper should be written in third person, follow APA formatting, and include both course concepts and personal observations from labs or real-world experiences (work, school, or personal technology use).

    Avoid bullet-point answers or copying language from the labs, textbook, or PowerPoint slides. Papers that rely heavily on definitions or generic explanations will not meet expectations.

    Required Discussion Areas

    1. Operating Systems and Hardware Interaction

    · Explain how operating systems interact with hardware and system components. Discuss the operating system you are most familiar with and how it manages system performance or resources. Describe observations from labs or personal device use related to startup behavior, responsiveness, or hardware management.

    2. Filesystems, Installation, and Operating System Choices

    · Reflect on your experience installing, upgrading, or observing an operating system during labs or on a personal device.

    · Discuss how choosing an inappropriate operating system or edition could create challenges in a home or business environment.

    3. Windows Configuration and Local Network Management

    · Discuss Windows settings or configurations that stood out to you as important, confusing, or useful.

    · Explain how local network configuration affects device connectivity and user productivity.

    · Reflect on how your confidence with basic troubleshooting or configuration has changed since completing the labs.

    4. User Accounts, Domains, and Access Control

    · Reflect on environments you have seen where user accounts are managed (school, workplace, lab environment).

    · Explain why organizations might choose centralized user management instead of local accounts.

    · Discuss how improper account management could affect security, access, or efficiency.

    5. Cross-Platform Skills

    · Explain why IT professionals benefit from being comfortable with more than one operating system.

    Conclusion

    · Summarize how your understanding of operating systems and system management has developed over the course.

    · Identify skills or concepts you feel most prepared to apply in a real IT support role.

    · Reflect on how the labs contributed to your learning beyond reading or lectures.

    Sources and Citations

    · Include a minimum of three credible sources

    · Course materials may be used, but outside sources are encouraged. All sources must be cited using APA 7th edition in-text citations and listed on a References page

    APA Formatting Requirements

    · APA title page

    · 12-point Times New Roman font

    · Double-spaced

    · 1-inch margins

    · Page numbers

    · Proper in-text citations and references

    **A220-1202Module11.pptx**

    This file is too large to display. [View in new window](https://www.sweetstudy.com/files/a220-1202module11-pptx)

    **## OperatingSystemsandReal-WorldSystemManagement.docx**

    Write a 2–4 page paper that addresses all of the sections below. Your paper should be written in third person, follow APA formatting, and include both course concepts and personal observations from labs or real-world experiences (work, school, or personal technology use).

    Avoid bullet-point answers or copying language from the labs, textbook, or PowerPoint slides. Papers that rely heavily on definitions or generic explanations will not meet expectations.

    Required Discussion Areas

    1. Operating Systems and Hardware Interaction

    · Explain how operating systems interact with hardware and system components. Discuss the operating system you are most familiar with and how it manages system performance or resources. Describe observations from labs or personal device use related to startup behavior, responsiveness, or hardware management.

    2. Filesystems, Installation, and Operating System Choices

    · Reflect on your experience installing, upgrading, or observing an operating system during labs or on a personal device.

    · Discuss how choosing an inappropriate operating system or edition could create challenges in a home or business environment.

    3. Windows Configuration and Local Network Management

    · Discuss Windows settings or configurations that stood out to you as important, confusing, or useful.

    · Explain how local network configuration affects device connectivity and user productivity.

    · Reflect on how your confidence with basic troubleshooting or configuration has changed since completing the labs.

    4. User Accounts, Domains, and Access Control

    · Reflect on environments you have seen where user accounts are managed (school, workplace, lab environment).

    · Explain why organizations might choose centralized user management instead of local accounts.

    · Discuss how improper account management could affect security, access, or efficiency.

    5. Cross-Platform Skills

    · Explain why IT professionals benefit from being comfortable with more than one operating system.

    Conclusion

    · Summarize how your understanding of operating systems and system management has developed over the course.

    · Identify skills or concepts you feel most prepared to apply in a real IT support role.

    · Reflect on how the labs contributed to your learning beyond reading or lectures.

    Sources and Citations

    · Include a minimum of three credible sources

    · Course materials may be used, but outside sources are encouraged. All sources must be cited using APA 7th edition in-text citations and listed on a References page

    APA Formatting Requirements

    · APA title page

    · 12-point Times New Roman font

    · Double-spaced

    · 1-inch margins

    · Page numbers

    · Proper in-text citations and references

    **A220-1202Module11.pptx**

    This file is too large to display. [View in new window](https://www.sweetstudy.com/files/a220-1202module11-pptx)

  • [Solved] manhattan

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    **files (1)** – ## Manhattan-GoogleDocs.pdf **## Manhattan-GoogleDocs.pdf** Read the article, Redefining Competition in Healthcare, which is taken from: Porter, M. & Teisberg, E. (2004, June). Redefining Competition in Healthcare . Harvard Business Review, pp 65-76. Main Response (250 words) : What …

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    **files (1)**

    – ## Manhattan-GoogleDocs.pdf

    **## Manhattan-GoogleDocs.pdf**

    Read the article, Redefining Competition in Healthcare, which is taken from: Porter, M.
    & Teisberg, E. (2004, June). Redefining Competition in Healthcare . Harvard Business

    Review, pp 65-76.

    Main Response (250 words) : What are the key gems from operations management

    perspective in the above article. Why do you consider them to be key gems? Discuss

    application of a few of these identified gems in the context of your current or any previous

    work setting

    N.B. pls. make sure to read the Rubrics provided below on this Reading Assignments

    before answering). Note that a simple summary of this article is not enough for the main

    response question. Your response must demonstrate critical thinking by relating authors'

    ideas in the context of your current and/or some work situation.

    Rubric

    Evaluation Criteria
    Yes Somewhat No

    Critical Thinking : main

    response is well thought out

    with major OM

    themes/gems clearly

    identified and clarity of

    argument provided for

    selecting these themes

    4 – most major OM

    themes clearly

    identified and

    justification

    arguments

    provided.

    1 0

    Application : fully applies all
    the main OM themes/gems

    identified to a real world

    setting

    3 – provides

    discussion for

    application of major

    themes in a

    thorough manner

    1 0

    Interacts : provides

    reflections to the main

    response of at least 2 other

    students which expands,

    clarifies, or advances the

    discussion.

    2 – responds to at

    least 2 students

    1 – responds to

    at least 1

    student

    0 – Either replies are

    on the level of "me

    too" or "I agree," or

    are off topic or does

    not respond/interact

    to other students’

    postings at all

    Timeliness : initial post

    response and reflections

    made on or before the due

    dates

    1 – always on time – 0 – not on time

    **## Manhattan-GoogleDocs.pdf**

    Read the article, Redefining Competition in Healthcare, which is taken from: Porter, M.
    & Teisberg, E. (2004, June). Redefining Competition in Healthcare . Harvard Business

    Review, pp 65-76.

    Main Response (250 words) : What are the key gems from operations management

    perspective in the above article. Why do you consider them to be key gems? Discuss

    application of a few of these identified gems in the context of your current or any previous

    work setting

    N.B. pls. make sure to read the Rubrics provided below on this Reading Assignments

    before answering). Note that a simple summary of this article is not enough for the main

    response question. Your response must demonstrate critical thinking by relating authors'

    ideas in the context of your current and/or some work situation.

    Rubric

    Evaluation Criteria
    Yes Somewhat No

    Critical Thinking : main

    response is well thought out

    with major OM

    themes/gems clearly

    identified and clarity of

    argument provided for

    selecting these themes

    4 – most major OM

    themes clearly

    identified and

    justification

    arguments

    provided.

    1 0

    Application : fully applies all
    the main OM themes/gems

    identified to a real world

    setting

    3 – provides

    discussion for

    application of major

    themes in a

    thorough manner

    1 0

    Interacts : provides

    reflections to the main

    response of at least 2 other

    students which expands,

    clarifies, or advances the

    discussion.

    2 – responds to at

    least 2 students

    1 – responds to

    at least 1

    student

    0 – Either replies are

    on the level of "me

    too" or "I agree," or

    are off topic or does

    not respond/interact

    to other students’

    postings at all

    Timeliness : initial post

    response and reflections

    made on or before the due

    dates

    1 – always on time – 0 – not on time

  • [Solved] Information Systems Unit 5 Assignment

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    1 Directions: Exercise: Database Design for Secure Software Applications 2 Directions: Project 2: Memo and Flyer for Top School University – [\ \ Unit5Assignment2Directions.docx](https://www.sweetstudy.com/files/unit5assignment2directions-docx "Unit5Assignment2Directions.docx") – [\ \ Unit5Assig…

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    1 Directions: Exercise: Database Design for Secure Software Applications

    2 Directions: Project 2: Memo and Flyer for Top School University

    – [\
    \
    Unit5Assignment2Directions.docx](https://www.sweetstudy.com/files/unit5assignment2directions-docx "Unit5Assignment2Directions.docx")
    – [\
    \
    Unit5Assignment1Directions.docx](https://www.sweetstudy.com/files/unit5assignment1directions-docx "Unit5Assignment1Directions.docx")

  • [Solved] Help with system change course

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    – 2 years ago **files (1)** – ## help1.docx **## help1.docx** · What do critical pragmatism, improvement research, and democracy have to do with each other? · How do you make sense of your personal epistemology / worldview and improvement science? · Improvement science focuses on being problem focus…

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    – 2 years ago

    **files (1)**

    – ## help1.docx

    **## help1.docx**

    · What do critical pragmatism, improvement research, and democracy have to do with each other?

    · How do you make sense of your personal epistemology / worldview and improvement science?

    · Improvement science focuses on being problem focused and user centered, but it also uses methods and theory responsibly and ethically. How are you making sense of the challenge of cohesively combining problem focused and user centered concepts with methods and theory?

    · How might improvement science approaches change your approaches to teaming and leadership?

    Class is called System Change

    Book is improvement science

    **Instructions: 500-800 words**

    **## help1.docx**

    · What do critical pragmatism, improvement research, and democracy have to do with each other?

    · How do you make sense of your personal epistemology / worldview and improvement science?

    · Improvement science focuses on being problem focused and user centered, but it also uses methods and theory responsibly and ethically. How are you making sense of the challenge of cohesively combining problem focused and user centered concepts with methods and theory?

    · How might improvement science approaches change your approaches to teaming and leadership?

    Class is called System Change

    Book is improvement science

    **Instructions: 500-800 words**

  • [Solved] HIMS W5

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    Assume you are working for a healthcare facility that does not have a health informatics governance policy yet. Discuss the **justification** for the formulation of a health informatics governance policy within your organization, include the following: Identify the business structure, location, and …

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    Assume you are working for a healthcare facility that does not have a health informatics governance policy yet. Discuss the **justification** for the formulation of a health informatics governance policy within your organization, include the following:

    Identify the business structure, location, and type of the healthcare provider you use for this discussion (real or fictitious one).

    Why is health informatics governance important for your healthcare organization?

    What issues your healthcare organizations can face without a health informatics governance policy in place?

    What areas of health informatics governance would you consider for inclusion in this policy?

    Respond to a minimum two of your peers with a substantive comment assessing the proposed justification for the health informatics governance policy development. Follow APA formatting, referencing credible evidence. Only one outside source is allowed. Use the content of this class as the main source of evidence.

    – 2 years ago

  • [Solved] HIMS W5

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    Assume you are working for a healthcare facility that does not have a health informatics governance policy yet. Discuss the **justification** for the formulation of a health informatics governance policy within your organization, include the following: Identify the business structure, location, and …

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    Assume you are working for a healthcare facility that does not have a health informatics governance policy yet. Discuss the **justification** for the formulation of a health informatics governance policy within your organization, include the following:

    Identify the business structure, location, and type of the healthcare provider you use for this discussion (real or fictitious one).

    Why is health informatics governance important for your healthcare organization?

    What issues your healthcare organizations can face without a health informatics governance policy in place?

    What areas of health informatics governance would you consider for inclusion in this policy?

    Respond to a minimum two of your peers with a substantive comment assessing the proposed justification for the health informatics governance policy development. Follow APA formatting, referencing credible evidence. Only one outside source is allowed. Use the content of this class as the main source of evidence.

    – 2 years ago

  • [Solved] EHR SURVEY

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    EHR usability is the extent to which EHR can be used by providers to achieve specific goals efficiently and effectively leading to fewer clinicians’ burnout, fewer medical errors, less alert fatigue, improved patient safety, greater user satisfaction, and consequently higher EHR-related productivity…

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    EHR usability is the extent to which EHR can be used by providers to achieve specific goals efficiently and effectively leading to fewer clinicians’ burnout, fewer medical errors, less alert fatigue, improved patient safety, greater user satisfaction, and consequently higher EHR-related productivity.

    As an aspiring healthcare manager, you need to determine the usability of EHR and seek a grant for this research. The research proposal should include five parameters:  _effectiveness_ (task completion), _efficiency_ (time of task completion), _satisfaction_ (task rating), _alert_ (pointing errors), and _reminders_ (follow-up). For this assignment design a survey using _Survey Monkey_ or any other applications to attain this information on a 5-point _Likert Scale_ (1- Strongly Disagree, 2-Disagree, 3- Neutral, 4- Agree, 5- Strongly Agree)  and explain:

    1. If the number of users is 1000 but you had limited resources, what is (%) minimal of the employees would you select for this survey to ensure representation of the user (offer supporting arguments)?
    2. Which of the three research methods (personal interviews, mail-in paper forms, email-embedded survey link) of obtaining this information would you use (offer rationale)?
    3. Which statistical method would you use to determine whether the means of these five _Likert Scale_ groups are _significantly different_ from one another and why?
    4. If the means of any of these Likert Scale groups were not _statistically different_ from each other, but still different, what would be your interpretation of the variations?

    Submit the paper and Survey Monkey link to the drop box.

    Note: For _Survey Monkey_ you need to make a free account. Submit the survey link in the dropbox for grading.

    – [\
    \
    ASSIGNMENT5EHRSURVEY-DUEFEB11.docx](https://www.sweetstudy.com/files/assignment5ehrsurvey-duefeb11-docx "ASSIGNMENT5EHRSURVEY-DUEFEB11.docx")

    – 2 years ago

  • [Solved] W5 D5 INFA

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    For this discussion, you will prepare a short handout (3-5 paragraphs — approximately 1 page if printed) to be included in a new employee orientation session. In your handout, discuss the primary methods for establishing a person's identity and then discuss how the individual's unique characteristi…

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    For this discussion, you will prepare a short handout (3-5 paragraphs — approximately 1 page if printed) to be included in a new employee orientation session. In your handout, discuss the primary methods for establishing a person's identity and then discuss how the individual's unique characteristics will be used to control access to the organization's enterprise IT resources and systems. Use information from the AC (Access Control) and IA (Identification and Authentication) families of security controls as authoritative sources for the requirement that employees provide identity documents and allow their physical characteristics to be measured for use as biometric factors in the identification and authorization processes used to grant access to email, timekeeping, and other web- or cloud-based IT services.

    Remember to use and cite authoritative sources in your work. Place your list of references at the end of your paper.

    Remember to submit your discussion response to the Turn It In for Discussions assignment folder. See the forum instructions for more information.

    – 2 years ago

  • [Solved] III

    ✓ Verified Academic Solution Available

    Executive Solution Overview

    See attached – 2 years ago **files (2)** – ## III.docx – ## UnitIII2.pdf **## III.docx** The purpose of the PowerPoint presentation is to show threats, vulnerabilities, and recommendations in an affinity diagram. An example of this diagram is provided in your textbook in Chapter 4. As a risk managem…

    Instant Solution Download

    $6.99

    Immediate access to the full model answer, formatted citations, and rubric breakdown.

    Need a Fresh Custom Paper?

    Have this question answered from scratch according to your specific instructions and deadline.

    Order on TutorsGallery →

    Assignment Prompt & Instructions

    See attached

    – 2 years ago

    **files (2)**

    – ## III.docx

    – ## UnitIII2.pdf

    **## III.docx**

    The purpose of the PowerPoint presentation is to show threats, vulnerabilities, and recommendations in an affinity diagram. An example of this diagram is provided in your textbook in Chapter 4.

    As a risk management project manager, you must identify the threats, vulnerabilities, and recommendations for ABC IT Organization's application database server. The following must be provided with speaker notes in the notes section of each slide.

    1. Title Slide

    2. Threat Slide

    3. Vulnerability Slide

    4. Recommendation Slide

    5. Reference Slide

    Your presentation must be at least five slides in length. Slides two, three, and four must contain at least one graphic (picture, photograph, graph). Your slides must contain speaker notes. You are required to use at least three resources in your presentation, one of which must be your textbook and one must be from the CSU Online Library. Your reference slide and in-text citations must be in APA style

    TEXTBOOK: Gibson, D., & Igonor, A. (2022). Managing risk in information systems (3rd ed.). Jones & Bartlett Learning. https://online.vitalsource.com/#/books/9781284193633

    **## UnitIII2.pdf**

    SEC 4301, IS Disaster Recovery 1

    Course Learning Outcomes for Unit III

    Upon completion of this unit, students should be able to:

    2. Develop an asset ranking report.
    2.1 Process the five performance areas before evaluating the risk assessment.

    3. Analyze an impact assessment for organization threat analysis.

    3.1 Calculate which method of qualitative or quantitative that impacts critical asset(s).
    3.2 Investigate the critical steps for major components for successful risk assessment impacts.

    Required Unit Resources

    Chapter 5: Defining Risk Assessment Approaches

    Chapter 6: Performing a Risk Assessment

    Unit Lesson

    Risk Assessment Explained

    You may have seen the movie or have been fortunate to see the stage play Cabaret; if not, you may have at
    least heard the song “Money Makes the World Go Round” sung by Liza Minnelli and Joel Grey. This analogy
    is about the importance of money to businesses; if the world stopped so would the cash flow. Businesses
    must allocate money for security funding; part of that funding or budget must address risk assessments.
    Without this funding, there will be no risk assessment, and the business will be subjugated to vulnerabilities
    that will plague the business to failure. Management must provide the best balance between the profitability of
    business and the survivability of risks that can harm the business.

    According to Gibson (2015), risk assessment is risk analysis and is responsible for identifying and evaluating
    risks. The risks are prioritized by management as acknowledged in the risk management program. Below are
    brief attributes of risk assessments.

    • Time: Risk assessment is dependent on time during its creation.
    • Monitoring: Continual monitoring of the risk management program is needed.
    • Controls: Safeguards effect the risk assessment (Gibson, 2015).

    The purpose for risk assessment is to provide management the tools to evaluate and identify controls that
    support the decision-making process and to assess the effectiveness of the controls (Gibson, 2015). The
    steps below assist management in the evaluation and identification of the risk assessment.

    UNIT III STUDY GUIDE
    Risk Assessment Concepts

    SEC 4301, IS Disaster Recovery 2

    UNIT x STUDY GUIDE
    Title

    Figure 3.1: Five steps to identify risk assessment

    (Adapted from Gibson, 2015, p. 115)

    Critical Components Triad

    The above steps allow management to effectively classify the risks and control the types of threats and
    vulnerabilities encountered from these risks. There are three critical steps that help identify the major
    components that influence the successful impact of risk assessment. These steps are illustrated in Figure 3.2.

    In the previous unit, the scope was identified as a product or project within project management. Therefore,
    as a product, risk assessment scope examines what assets of the information technology infrastructure might
    be impacted by the threats and vulnerabilities. The scope could be one or more of the seven domains; that
    was covered in Unit I of this course. For instance, the System/Application Domain, as shown in Figure 3.3
    below, illustrates the scope’s boundary for the risk assessment.

    Figure 3.2: Risk Assessment Triad

    (Gibson, 2015)

    SEC 4301, IS Disaster Recovery 3

    UNIT x STUDY GUIDE
    Title

    Figure 3.4 shows the critical components that need to be identified as risk assessment impact areas for the
    scope. The products involved as shown in Figure 3.3 are firewalls, mainframe computer, and application and
    Web servers. Each of these components will need to have the single point of failure identified that is hardware
    in nature, software code attacks, and any controls associated with the hardware setup of each component.

    Figure 3.3: System/Application Domain

    (Gibson, 2015, p. 7)

    Team members from the risk assessment project must be fluent in information technology (IT) operations
    of the seven domains and are not part of the mitigating team or group that corrects the deficiencies that
    are found in the scope area. This eliminates the team members from a conflict of interest when mitigating
    the deficiencies.

    Qualitative or Quantitative Methods

    During the risk assessment process there are two methodologies of quantifying risks; these methods are
    qualitative and quantitative. Below are the differences between the two methodologies.

    • Qualitative: This involves subjective methodology and acts on categorical variables such as low,
    medium, or high, to express the possibility of risk impacts for management decision-making.
    Identifying the risk level is done through probability or impact opinion statements from experts
    (Gibson, 2015).

    • Quantitative: This objective methodology uses specific data, such as mathematical calculations, to
    arrive at a numerical decision-making process. Such formulas include single loss expectancy, annual
    loss expectancy, annual rate of occurrence, or safeguard values (Gibson, 2015).

    Challenges to Risk Assessment

    There are many challenges to risks, and rightly so, as each risk is dependent on the assessment type
    selected by management as well as the methodologies mentioned above. Such challenges are mention
    below:

    • static process technique for moving target(s),
    • data and resource availability,
    • data accuracy,
    • effects of impact through estimation, and
    • useful results that assist risk acceptance and resource allocation (Gibson, 2015).

    SEC 4301, IS Disaster Recovery 4

    UNIT x STUDY GUIDE
    Title

    Describing the Assessment

    With the understanding of risk assessment and which methodology to use, we can move forward in identifying
    the IT asset through two primary areas in classifying the systems or processes. Therefore, if we look at Figure
    3.3 System/Application Domain above, we see an application and Web server. Take the Web server for
    example; everyone in a typical organization will have access to the Web server. However, what type of
    access is granted to employees? The system administrator needs to know how the Web server operates and
    is configured in order to provide proper allocation of resources to the employees. This is important, as certain
    employees will need access to websites for purchasing equipment for the organization while others do not.
    Human resource (HR) employees will need full access rights to the organization’s employee website, but
    restricted access is given to other employees to just view their own information. Therefore, two primary
    focuses for any asset are operational characteristics and the mission of the system (Gibson, 2015).

    Identifying and Evaluating Risk Assessment

    Before performing the risk assessment, there are five performance areas that must be considered. These
    areas are illustrated in Figure 3.4 below.

    Figure 3.4: Performance Processes

    (Gibson, 2015)

    Management needs to assign ownership of the different areas of assets within the organizational IT
    infrastructure. Such ownership allows the ease of mitigating the risks when it is time to implement the risk
    recommendations to the assets (Gibson, 2015). Examples of ownership to IT assets are network devices,
    different servers (email, database, Web), user and computer management, and configuration/change
    management. The assignment of ownership will make it easier to stay within the risk assessment scope for
    the organizational assets.

    Information technology assets within an organization will depreciate over time. Therefore, it is imperative that
    critical assets be identified to be replaced since these assets will be the number one priority for risk
    management. The replacement cost or upgrade of the depreciated asset is known as asset valuation. The
    value of the asset is rated by two different viewpoints as indicated below.

    • Replacement value is the direct cost of replacing the asset in its entirety.
    • Recovery value costs involve parts that need to be replaced due to failure within the asset. Examples

    are cooling fans, hard drives, and input devices (Gibson, 2015).

    Previously, we identified threats to be any individual or software codes that can cause harm to the IT
    infrastructure to damage or endanger devices and/or people (Gibson, 2015). Consequently, identifying the

    SEC 4301, IS Disaster Recovery 5

    UNIT x STUDY GUIDE
    Title

    threats is the necessary process of the threat assessment plan. Figure 3.5 below illustrates the threat attack
    sequence in the path for loss of impact of an asset.

    Figure 3.5: Threat Cycle

    (Adapted from Gibson, 2015, p. 149)

    Reviewing the organization’s historical data as well as threat modeling will ensure all threats have been
    identified and evaluated in the risk assessment (Gibson, 2015).

    Remember, vulnerabilities are the degree to which people or systems are susceptible to impairment or
    incompatibility of IT assets as identified in Unit II. As such, all IT assets have a variety of vulnerabilities that
    can affect the operation of the asset; not all vulnerabilities can cause undue harm to the assets (Gibson,
    2015). Discovering a weakness in the IT asset is known as a vulnerability assessment. Gathering information
    about the vulnerability assessment is important. Vulnerability tools such as Retina, Nmap, and Nessus are
    used to scan the network of an organization for vulnerabilities.

    Safeguarding controls or providing security enhancements to controls are countermeasures used to prevent
    or reduce the threats and vulnerability attacks from hackers. Controls that affect the countermeasures are
    either in-place controls, meaning these controls are already part of the asset, or system or planned controls,
    which have an implementation date for those controls to be activated (Gibson, 2015). There are three types or
    categories that affect the controls that are either in-place or planned controls. These control categories are
    represented in Figure 3.6.

    SEC 4301, IS Disaster Recovery 6

    UNIT x STUDY GUIDE
    Title

    Figure 3.6: Safeguard Controls

    (Gibson, 2015)

    • Procedural controls are based on certain rules and procedures that are governed by the management
    in the organization.

    • Technical controls are automatic controls that are the highpoint for safeguarding controls by computer
    and/or software applications that protect the systems and provide constant protection.

    • Physical controls, as stated, are physical in nature including locks, gates, security guards, closed-
    circuit TV cameras, fire suppression systems, and any hardware equipment used to control the
    physical environment for the organization (Gibson, 2015).

    Summary

    Once all the risk assessments have been identified, the risk management coordinator will decide which
    methodology to implement. The choice of methods of either qualitative or quantitative, as explain earlier in
    this unit, would be used to determine the assessment needs. Again, this depends on costs of the assets. If
    you have a cost figure, then quantitative method would be used; if there is no arbitrary cost on the asset, then
    the qualitative method will be employed. Information derived from the risk assessment will then be used to
    formulate how risks are to be mitigated and to determine best practices for performing the risk assessments.

    Reference

    Gibson, D. (2015). Managing risk in information systems (2nd ed.). Jones and Bartlett Learning.

    https://online.vitalsource.com/#/books/9781284107753

    Suggested Unit Resources

    In order to access the following resources, click the links below.

    The following presentations will summarize and reinforce the information from Chapters 5 and 6 in your
    textbook.

    Chapter 5 PowerPoint Presentation
    PDF Version of Chapter 5 PowerPoint Presentation

    Chapter 6 PowerPoint Presentation
    PDF Version of Chapter 6 PowerPoint Presentation

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1)

    SEC 4301, IS Disaster Recovery 7

    UNIT x STUDY GUIDE
    Title

    Learning Activities (Nongraded)

    Nongraded Learning Activities are provided to aid students in their course of study. You do not have to submit
    them. If you have questions, contact your instructor for further guidance and information.

    The following learning activities provide additional information that will assist you with the mastery of the
    learning objectives for this unit.

    Go to the CSU Online Library, and use the Discovery Search feature.

    Utilize the Discovery Search feature in the CSU Online Library, and type in the following phrases: “annual loss
    expectancy, qualitative risk, quantitative risk, risk safeguards, single point of failure, risk assessment threats.”
    Select and read two articles. Use the criteria of peer-reviewed article (scholarly) and less than five years old.
    Here is a link straight to the CSU Online Library Discovery Search.

    The internet can provide you with a wealth of information concerning the topics in this unit. For example, the
    following video is from CSU Films on Demand database and provides additional information about risk
    assessment.

    Skillbank Solutions Ltd (Producer). (1999). Risk assessment (Segment 6 of 7) [Video]. In Computer Security.

    Films on Demand.
    https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPla
    ylists.aspx?wID=273866&xtid=11727&loid=14503

    The transcript for this video can be found by clicking the “Transcript” tab to the right of the video in the Films
    on Demand database.

    Check Your Knowledge

    These questions will help you assess whether or not you have mastered the unit content. Can you answer
    them without looking in the textbook?

    • Answer the Chapter 5 Assessment questions at the end of Chapter 5 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 5 Answer Key.

    • Answer the Chapter 6 Assessment questions at the end of Chapter 6 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 6 Answer Key.

    Word Search

    Some of this unit’s key terms and phrases (written as one word) have been hidden in the word search puzzle.
    Access the Unit III Word Search puzzle, and see if you can find them.

    [http://libguides.columbiasouthern.edu/?b=p](http://libguides.columbiasouthern.edu/?b=p)

    [https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503](https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1)

    – Course Learning Outcomes for Unit III
    – Required Unit Resources
    – Unit Lesson

    – Risk Assessment Explained
    – Critical Components Triad
    – Qualitative or Quantitative Methods
    – Challenges to Risk Assessment
    – Describing the Assessment
    – Identifying and Evaluating Risk Assessment
    – Summary
    – Reference

    – Suggested Unit Resources
    – Learning Activities (Nongraded)

    **## UnitIII2.pdf**

    SEC 4301, IS Disaster Recovery 1

    Course Learning Outcomes for Unit III

    Upon completion of this unit, students should be able to:

    2. Develop an asset ranking report.
    2.1 Process the five performance areas before evaluating the risk assessment.

    3. Analyze an impact assessment for organization threat analysis.

    3.1 Calculate which method of qualitative or quantitative that impacts critical asset(s).
    3.2 Investigate the critical steps for major components for successful risk assessment impacts.

    Required Unit Resources

    Chapter 5: Defining Risk Assessment Approaches

    Chapter 6: Performing a Risk Assessment

    Unit Lesson

    Risk Assessment Explained

    You may have seen the movie or have been fortunate to see the stage play Cabaret; if not, you may have at
    least heard the song “Money Makes the World Go Round” sung by Liza Minnelli and Joel Grey. This analogy
    is about the importance of money to businesses; if the world stopped so would the cash flow. Businesses
    must allocate money for security funding; part of that funding or budget must address risk assessments.
    Without this funding, there will be no risk assessment, and the business will be subjugated to vulnerabilities
    that will plague the business to failure. Management must provide the best balance between the profitability of
    business and the survivability of risks that can harm the business.

    According to Gibson (2015), risk assessment is risk analysis and is responsible for identifying and evaluating
    risks. The risks are prioritized by management as acknowledged in the risk management program. Below are
    brief attributes of risk assessments.

    • Time: Risk assessment is dependent on time during its creation.
    • Monitoring: Continual monitoring of the risk management program is needed.
    • Controls: Safeguards effect the risk assessment (Gibson, 2015).

    The purpose for risk assessment is to provide management the tools to evaluate and identify controls that
    support the decision-making process and to assess the effectiveness of the controls (Gibson, 2015). The
    steps below assist management in the evaluation and identification of the risk assessment.

    UNIT III STUDY GUIDE
    Risk Assessment Concepts

    SEC 4301, IS Disaster Recovery 2

    UNIT x STUDY GUIDE
    Title

    Figure 3.1: Five steps to identify risk assessment

    (Adapted from Gibson, 2015, p. 115)

    Critical Components Triad

    The above steps allow management to effectively classify the risks and control the types of threats and
    vulnerabilities encountered from these risks. There are three critical steps that help identify the major
    components that influence the successful impact of risk assessment. These steps are illustrated in Figure 3.2.

    In the previous unit, the scope was identified as a product or project within project management. Therefore,
    as a product, risk assessment scope examines what assets of the information technology infrastructure might
    be impacted by the threats and vulnerabilities. The scope could be one or more of the seven domains; that
    was covered in Unit I of this course. For instance, the System/Application Domain, as shown in Figure 3.3
    below, illustrates the scope’s boundary for the risk assessment.

    Figure 3.2: Risk Assessment Triad

    (Gibson, 2015)

    SEC 4301, IS Disaster Recovery 3

    UNIT x STUDY GUIDE
    Title

    Figure 3.4 shows the critical components that need to be identified as risk assessment impact areas for the
    scope. The products involved as shown in Figure 3.3 are firewalls, mainframe computer, and application and
    Web servers. Each of these components will need to have the single point of failure identified that is hardware
    in nature, software code attacks, and any controls associated with the hardware setup of each component.

    Figure 3.3: System/Application Domain

    (Gibson, 2015, p. 7)

    Team members from the risk assessment project must be fluent in information technology (IT) operations
    of the seven domains and are not part of the mitigating team or group that corrects the deficiencies that
    are found in the scope area. This eliminates the team members from a conflict of interest when mitigating
    the deficiencies.

    Qualitative or Quantitative Methods

    During the risk assessment process there are two methodologies of quantifying risks; these methods are
    qualitative and quantitative. Below are the differences between the two methodologies.

    • Qualitative: This involves subjective methodology and acts on categorical variables such as low,
    medium, or high, to express the possibility of risk impacts for management decision-making.
    Identifying the risk level is done through probability or impact opinion statements from experts
    (Gibson, 2015).

    • Quantitative: This objective methodology uses specific data, such as mathematical calculations, to
    arrive at a numerical decision-making process. Such formulas include single loss expectancy, annual
    loss expectancy, annual rate of occurrence, or safeguard values (Gibson, 2015).

    Challenges to Risk Assessment

    There are many challenges to risks, and rightly so, as each risk is dependent on the assessment type
    selected by management as well as the methodologies mentioned above. Such challenges are mention
    below:

    • static process technique for moving target(s),
    • data and resource availability,
    • data accuracy,
    • effects of impact through estimation, and
    • useful results that assist risk acceptance and resource allocation (Gibson, 2015).

    SEC 4301, IS Disaster Recovery 4

    UNIT x STUDY GUIDE
    Title

    Describing the Assessment

    With the understanding of risk assessment and which methodology to use, we can move forward in identifying
    the IT asset through two primary areas in classifying the systems or processes. Therefore, if we look at Figure
    3.3 System/Application Domain above, we see an application and Web server. Take the Web server for
    example; everyone in a typical organization will have access to the Web server. However, what type of
    access is granted to employees? The system administrator needs to know how the Web server operates and
    is configured in order to provide proper allocation of resources to the employees. This is important, as certain
    employees will need access to websites for purchasing equipment for the organization while others do not.
    Human resource (HR) employees will need full access rights to the organization’s employee website, but
    restricted access is given to other employees to just view their own information. Therefore, two primary
    focuses for any asset are operational characteristics and the mission of the system (Gibson, 2015).

    Identifying and Evaluating Risk Assessment

    Before performing the risk assessment, there are five performance areas that must be considered. These
    areas are illustrated in Figure 3.4 below.

    Figure 3.4: Performance Processes

    (Gibson, 2015)

    Management needs to assign ownership of the different areas of assets within the organizational IT
    infrastructure. Such ownership allows the ease of mitigating the risks when it is time to implement the risk
    recommendations to the assets (Gibson, 2015). Examples of ownership to IT assets are network devices,
    different servers (email, database, Web), user and computer management, and configuration/change
    management. The assignment of ownership will make it easier to stay within the risk assessment scope for
    the organizational assets.

    Information technology assets within an organization will depreciate over time. Therefore, it is imperative that
    critical assets be identified to be replaced since these assets will be the number one priority for risk
    management. The replacement cost or upgrade of the depreciated asset is known as asset valuation. The
    value of the asset is rated by two different viewpoints as indicated below.

    • Replacement value is the direct cost of replacing the asset in its entirety.
    • Recovery value costs involve parts that need to be replaced due to failure within the asset. Examples

    are cooling fans, hard drives, and input devices (Gibson, 2015).

    Previously, we identified threats to be any individual or software codes that can cause harm to the IT
    infrastructure to damage or endanger devices and/or people (Gibson, 2015). Consequently, identifying the

    SEC 4301, IS Disaster Recovery 5

    UNIT x STUDY GUIDE
    Title

    threats is the necessary process of the threat assessment plan. Figure 3.5 below illustrates the threat attack
    sequence in the path for loss of impact of an asset.

    Figure 3.5: Threat Cycle

    (Adapted from Gibson, 2015, p. 149)

    Reviewing the organization’s historical data as well as threat modeling will ensure all threats have been
    identified and evaluated in the risk assessment (Gibson, 2015).

    Remember, vulnerabilities are the degree to which people or systems are susceptible to impairment or
    incompatibility of IT assets as identified in Unit II. As such, all IT assets have a variety of vulnerabilities that
    can affect the operation of the asset; not all vulnerabilities can cause undue harm to the assets (Gibson,
    2015). Discovering a weakness in the IT asset is known as a vulnerability assessment. Gathering information
    about the vulnerability assessment is important. Vulnerability tools such as Retina, Nmap, and Nessus are
    used to scan the network of an organization for vulnerabilities.

    Safeguarding controls or providing security enhancements to controls are countermeasures used to prevent
    or reduce the threats and vulnerability attacks from hackers. Controls that affect the countermeasures are
    either in-place controls, meaning these controls are already part of the asset, or system or planned controls,
    which have an implementation date for those controls to be activated (Gibson, 2015). There are three types or
    categories that affect the controls that are either in-place or planned controls. These control categories are
    represented in Figure 3.6.

    SEC 4301, IS Disaster Recovery 6

    UNIT x STUDY GUIDE
    Title

    Figure 3.6: Safeguard Controls

    (Gibson, 2015)

    • Procedural controls are based on certain rules and procedures that are governed by the management
    in the organization.

    • Technical controls are automatic controls that are the highpoint for safeguarding controls by computer
    and/or software applications that protect the systems and provide constant protection.

    • Physical controls, as stated, are physical in nature including locks, gates, security guards, closed-
    circuit TV cameras, fire suppression systems, and any hardware equipment used to control the
    physical environment for the organization (Gibson, 2015).

    Summary

    Once all the risk assessments have been identified, the risk management coordinator will decide which
    methodology to implement. The choice of methods of either qualitative or quantitative, as explain earlier in
    this unit, would be used to determine the assessment needs. Again, this depends on costs of the assets. If
    you have a cost figure, then quantitative method would be used; if there is no arbitrary cost on the asset, then
    the qualitative method will be employed. Information derived from the risk assessment will then be used to
    formulate how risks are to be mitigated and to determine best practices for performing the risk assessments.

    Reference

    Gibson, D. (2015). Managing risk in information systems (2nd ed.). Jones and Bartlett Learning.

    https://online.vitalsource.com/#/books/9781284107753

    Suggested Unit Resources

    In order to access the following resources, click the links below.

    The following presentations will summarize and reinforce the information from Chapters 5 and 6 in your
    textbook.

    Chapter 5 PowerPoint Presentation
    PDF Version of Chapter 5 PowerPoint Presentation

    Chapter 6 PowerPoint Presentation
    PDF Version of Chapter 6 PowerPoint Presentation

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1)

    SEC 4301, IS Disaster Recovery 7

    UNIT x STUDY GUIDE
    Title

    Learning Activities (Nongraded)

    Nongraded Learning Activities are provided to aid students in their course of study. You do not have to submit
    them. If you have questions, contact your instructor for further guidance and information.

    The following learning activities provide additional information that will assist you with the mastery of the
    learning objectives for this unit.

    Go to the CSU Online Library, and use the Discovery Search feature.

    Utilize the Discovery Search feature in the CSU Online Library, and type in the following phrases: “annual loss
    expectancy, qualitative risk, quantitative risk, risk safeguards, single point of failure, risk assessment threats.”
    Select and read two articles. Use the criteria of peer-reviewed article (scholarly) and less than five years old.
    Here is a link straight to the CSU Online Library Discovery Search.

    The internet can provide you with a wealth of information concerning the topics in this unit. For example, the
    following video is from CSU Films on Demand database and provides additional information about risk
    assessment.

    Skillbank Solutions Ltd (Producer). (1999). Risk assessment (Segment 6 of 7) [Video]. In Computer Security.

    Films on Demand.
    https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPla
    ylists.aspx?wID=273866&xtid=11727&loid=14503

    The transcript for this video can be found by clicking the “Transcript” tab to the right of the video in the Films
    on Demand database.

    Check Your Knowledge

    These questions will help you assess whether or not you have mastered the unit content. Can you answer
    them without looking in the textbook?

    • Answer the Chapter 5 Assessment questions at the end of Chapter 5 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 5 Answer Key.

    • Answer the Chapter 6 Assessment questions at the end of Chapter 6 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 6 Answer Key.

    Word Search

    Some of this unit’s key terms and phrases (written as one word) have been hidden in the word search puzzle.
    Access the Unit III Word Search puzzle, and see if you can find them.

    [http://libguides.columbiasouthern.edu/?b=p](http://libguides.columbiasouthern.edu/?b=p)

    [https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503](https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1)

    – Course Learning Outcomes for Unit III
    – Required Unit Resources
    – Unit Lesson

    – Risk Assessment Explained
    – Critical Components Triad
    – Qualitative or Quantitative Methods
    – Challenges to Risk Assessment
    – Describing the Assessment
    – Identifying and Evaluating Risk Assessment
    – Summary
    – Reference

    – Suggested Unit Resources
    – Learning Activities (Nongraded)

    **## III.docx**

    The purpose of the PowerPoint presentation is to show threats, vulnerabilities, and recommendations in an affinity diagram. An example of this diagram is provided in your textbook in Chapter 4.

    As a risk management project manager, you must identify the threats, vulnerabilities, and recommendations for ABC IT Organization's application database server. The following must be provided with speaker notes in the notes section of each slide.

    1. Title Slide

    2. Threat Slide

    3. Vulnerability Slide

    4. Recommendation Slide

    5. Reference Slide

    Your presentation must be at least five slides in length. Slides two, three, and four must contain at least one graphic (picture, photograph, graph). Your slides must contain speaker notes. You are required to use at least three resources in your presentation, one of which must be your textbook and one must be from the CSU Online Library. Your reference slide and in-text citations must be in APA style

    TEXTBOOK: Gibson, D., & Igonor, A. (2022). Managing risk in information systems (3rd ed.). Jones & Bartlett Learning. https://online.vitalsource.com/#/books/9781284193633

    **## UnitIII2.pdf**

    SEC 4301, IS Disaster Recovery 1

    Course Learning Outcomes for Unit III

    Upon completion of this unit, students should be able to:

    2. Develop an asset ranking report.
    2.1 Process the five performance areas before evaluating the risk assessment.

    3. Analyze an impact assessment for organization threat analysis.

    3.1 Calculate which method of qualitative or quantitative that impacts critical asset(s).
    3.2 Investigate the critical steps for major components for successful risk assessment impacts.

    Required Unit Resources

    Chapter 5: Defining Risk Assessment Approaches

    Chapter 6: Performing a Risk Assessment

    Unit Lesson

    Risk Assessment Explained

    You may have seen the movie or have been fortunate to see the stage play Cabaret; if not, you may have at
    least heard the song “Money Makes the World Go Round” sung by Liza Minnelli and Joel Grey. This analogy
    is about the importance of money to businesses; if the world stopped so would the cash flow. Businesses
    must allocate money for security funding; part of that funding or budget must address risk assessments.
    Without this funding, there will be no risk assessment, and the business will be subjugated to vulnerabilities
    that will plague the business to failure. Management must provide the best balance between the profitability of
    business and the survivability of risks that can harm the business.

    According to Gibson (2015), risk assessment is risk analysis and is responsible for identifying and evaluating
    risks. The risks are prioritized by management as acknowledged in the risk management program. Below are
    brief attributes of risk assessments.

    • Time: Risk assessment is dependent on time during its creation.
    • Monitoring: Continual monitoring of the risk management program is needed.
    • Controls: Safeguards effect the risk assessment (Gibson, 2015).

    The purpose for risk assessment is to provide management the tools to evaluate and identify controls that
    support the decision-making process and to assess the effectiveness of the controls (Gibson, 2015). The
    steps below assist management in the evaluation and identification of the risk assessment.

    UNIT III STUDY GUIDE
    Risk Assessment Concepts

    SEC 4301, IS Disaster Recovery 2

    UNIT x STUDY GUIDE
    Title

    Figure 3.1: Five steps to identify risk assessment

    (Adapted from Gibson, 2015, p. 115)

    Critical Components Triad

    The above steps allow management to effectively classify the risks and control the types of threats and
    vulnerabilities encountered from these risks. There are three critical steps that help identify the major
    components that influence the successful impact of risk assessment. These steps are illustrated in Figure 3.2.

    In the previous unit, the scope was identified as a product or project within project management. Therefore,
    as a product, risk assessment scope examines what assets of the information technology infrastructure might
    be impacted by the threats and vulnerabilities. The scope could be one or more of the seven domains; that
    was covered in Unit I of this course. For instance, the System/Application Domain, as shown in Figure 3.3
    below, illustrates the scope’s boundary for the risk assessment.

    Figure 3.2: Risk Assessment Triad

    (Gibson, 2015)

    SEC 4301, IS Disaster Recovery 3

    UNIT x STUDY GUIDE
    Title

    Figure 3.4 shows the critical components that need to be identified as risk assessment impact areas for the
    scope. The products involved as shown in Figure 3.3 are firewalls, mainframe computer, and application and
    Web servers. Each of these components will need to have the single point of failure identified that is hardware
    in nature, software code attacks, and any controls associated with the hardware setup of each component.

    Figure 3.3: System/Application Domain

    (Gibson, 2015, p. 7)

    Team members from the risk assessment project must be fluent in information technology (IT) operations
    of the seven domains and are not part of the mitigating team or group that corrects the deficiencies that
    are found in the scope area. This eliminates the team members from a conflict of interest when mitigating
    the deficiencies.

    Qualitative or Quantitative Methods

    During the risk assessment process there are two methodologies of quantifying risks; these methods are
    qualitative and quantitative. Below are the differences between the two methodologies.

    • Qualitative: This involves subjective methodology and acts on categorical variables such as low,
    medium, or high, to express the possibility of risk impacts for management decision-making.
    Identifying the risk level is done through probability or impact opinion statements from experts
    (Gibson, 2015).

    • Quantitative: This objective methodology uses specific data, such as mathematical calculations, to
    arrive at a numerical decision-making process. Such formulas include single loss expectancy, annual
    loss expectancy, annual rate of occurrence, or safeguard values (Gibson, 2015).

    Challenges to Risk Assessment

    There are many challenges to risks, and rightly so, as each risk is dependent on the assessment type
    selected by management as well as the methodologies mentioned above. Such challenges are mention
    below:

    • static process technique for moving target(s),
    • data and resource availability,
    • data accuracy,
    • effects of impact through estimation, and
    • useful results that assist risk acceptance and resource allocation (Gibson, 2015).

    SEC 4301, IS Disaster Recovery 4

    UNIT x STUDY GUIDE
    Title

    Describing the Assessment

    With the understanding of risk assessment and which methodology to use, we can move forward in identifying
    the IT asset through two primary areas in classifying the systems or processes. Therefore, if we look at Figure
    3.3 System/Application Domain above, we see an application and Web server. Take the Web server for
    example; everyone in a typical organization will have access to the Web server. However, what type of
    access is granted to employees? The system administrator needs to know how the Web server operates and
    is configured in order to provide proper allocation of resources to the employees. This is important, as certain
    employees will need access to websites for purchasing equipment for the organization while others do not.
    Human resource (HR) employees will need full access rights to the organization’s employee website, but
    restricted access is given to other employees to just view their own information. Therefore, two primary
    focuses for any asset are operational characteristics and the mission of the system (Gibson, 2015).

    Identifying and Evaluating Risk Assessment

    Before performing the risk assessment, there are five performance areas that must be considered. These
    areas are illustrated in Figure 3.4 below.

    Figure 3.4: Performance Processes

    (Gibson, 2015)

    Management needs to assign ownership of the different areas of assets within the organizational IT
    infrastructure. Such ownership allows the ease of mitigating the risks when it is time to implement the risk
    recommendations to the assets (Gibson, 2015). Examples of ownership to IT assets are network devices,
    different servers (email, database, Web), user and computer management, and configuration/change
    management. The assignment of ownership will make it easier to stay within the risk assessment scope for
    the organizational assets.

    Information technology assets within an organization will depreciate over time. Therefore, it is imperative that
    critical assets be identified to be replaced since these assets will be the number one priority for risk
    management. The replacement cost or upgrade of the depreciated asset is known as asset valuation. The
    value of the asset is rated by two different viewpoints as indicated below.

    • Replacement value is the direct cost of replacing the asset in its entirety.
    • Recovery value costs involve parts that need to be replaced due to failure within the asset. Examples

    are cooling fans, hard drives, and input devices (Gibson, 2015).

    Previously, we identified threats to be any individual or software codes that can cause harm to the IT
    infrastructure to damage or endanger devices and/or people (Gibson, 2015). Consequently, identifying the

    SEC 4301, IS Disaster Recovery 5

    UNIT x STUDY GUIDE
    Title

    threats is the necessary process of the threat assessment plan. Figure 3.5 below illustrates the threat attack
    sequence in the path for loss of impact of an asset.

    Figure 3.5: Threat Cycle

    (Adapted from Gibson, 2015, p. 149)

    Reviewing the organization’s historical data as well as threat modeling will ensure all threats have been
    identified and evaluated in the risk assessment (Gibson, 2015).

    Remember, vulnerabilities are the degree to which people or systems are susceptible to impairment or
    incompatibility of IT assets as identified in Unit II. As such, all IT assets have a variety of vulnerabilities that
    can affect the operation of the asset; not all vulnerabilities can cause undue harm to the assets (Gibson,
    2015). Discovering a weakness in the IT asset is known as a vulnerability assessment. Gathering information
    about the vulnerability assessment is important. Vulnerability tools such as Retina, Nmap, and Nessus are
    used to scan the network of an organization for vulnerabilities.

    Safeguarding controls or providing security enhancements to controls are countermeasures used to prevent
    or reduce the threats and vulnerability attacks from hackers. Controls that affect the countermeasures are
    either in-place controls, meaning these controls are already part of the asset, or system or planned controls,
    which have an implementation date for those controls to be activated (Gibson, 2015). There are three types or
    categories that affect the controls that are either in-place or planned controls. These control categories are
    represented in Figure 3.6.

    SEC 4301, IS Disaster Recovery 6

    UNIT x STUDY GUIDE
    Title

    Figure 3.6: Safeguard Controls

    (Gibson, 2015)

    • Procedural controls are based on certain rules and procedures that are governed by the management
    in the organization.

    • Technical controls are automatic controls that are the highpoint for safeguarding controls by computer
    and/or software applications that protect the systems and provide constant protection.

    • Physical controls, as stated, are physical in nature including locks, gates, security guards, closed-
    circuit TV cameras, fire suppression systems, and any hardware equipment used to control the
    physical environment for the organization (Gibson, 2015).

    Summary

    Once all the risk assessments have been identified, the risk management coordinator will decide which
    methodology to implement. The choice of methods of either qualitative or quantitative, as explain earlier in
    this unit, would be used to determine the assessment needs. Again, this depends on costs of the assets. If
    you have a cost figure, then quantitative method would be used; if there is no arbitrary cost on the asset, then
    the qualitative method will be employed. Information derived from the risk assessment will then be used to
    formulate how risks are to be mitigated and to determine best practices for performing the risk assessments.

    Reference

    Gibson, D. (2015). Managing risk in information systems (2nd ed.). Jones and Bartlett Learning.

    https://online.vitalsource.com/#/books/9781284107753

    Suggested Unit Resources

    In order to access the following resources, click the links below.

    The following presentations will summarize and reinforce the information from Chapters 5 and 6 in your
    textbook.

    Chapter 5 PowerPoint Presentation
    PDF Version of Chapter 5 PowerPoint Presentation

    Chapter 6 PowerPoint Presentation
    PDF Version of Chapter 6 PowerPoint Presentation

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1)

    SEC 4301, IS Disaster Recovery 7

    UNIT x STUDY GUIDE
    Title

    Learning Activities (Nongraded)

    Nongraded Learning Activities are provided to aid students in their course of study. You do not have to submit
    them. If you have questions, contact your instructor for further guidance and information.

    The following learning activities provide additional information that will assist you with the mastery of the
    learning objectives for this unit.

    Go to the CSU Online Library, and use the Discovery Search feature.

    Utilize the Discovery Search feature in the CSU Online Library, and type in the following phrases: “annual loss
    expectancy, qualitative risk, quantitative risk, risk safeguards, single point of failure, risk assessment threats.”
    Select and read two articles. Use the criteria of peer-reviewed article (scholarly) and less than five years old.
    Here is a link straight to the CSU Online Library Discovery Search.

    The internet can provide you with a wealth of information concerning the topics in this unit. For example, the
    following video is from CSU Films on Demand database and provides additional information about risk
    assessment.

    Skillbank Solutions Ltd (Producer). (1999). Risk assessment (Segment 6 of 7) [Video]. In Computer Security.

    Films on Demand.
    https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPla
    ylists.aspx?wID=273866&xtid=11727&loid=14503

    The transcript for this video can be found by clicking the “Transcript” tab to the right of the video in the Films
    on Demand database.

    Check Your Knowledge

    These questions will help you assess whether or not you have mastered the unit content. Can you answer
    them without looking in the textbook?

    • Answer the Chapter 5 Assessment questions at the end of Chapter 5 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 5 Answer Key.

    • Answer the Chapter 6 Assessment questions at the end of Chapter 6 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 6 Answer Key.

    Word Search

    Some of this unit’s key terms and phrases (written as one word) have been hidden in the word search puzzle.
    Access the Unit III Word Search puzzle, and see if you can find them.

    [http://libguides.columbiasouthern.edu/?b=p](http://libguides.columbiasouthern.edu/?b=p)

    [https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503](https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1)

    – Course Learning Outcomes for Unit III
    – Required Unit Resources
    – Unit Lesson

    – Risk Assessment Explained
    – Critical Components Triad
    – Qualitative or Quantitative Methods
    – Challenges to Risk Assessment
    – Describing the Assessment
    – Identifying and Evaluating Risk Assessment
    – Summary
    – Reference

    – Suggested Unit Resources
    – Learning Activities (Nongraded)

    **## III.docx**

    The purpose of the PowerPoint presentation is to show threats, vulnerabilities, and recommendations in an affinity diagram. An example of this diagram is provided in your textbook in Chapter 4.

    As a risk management project manager, you must identify the threats, vulnerabilities, and recommendations for ABC IT Organization's application database server. The following must be provided with speaker notes in the notes section of each slide.

    1. Title Slide

    2. Threat Slide

    3. Vulnerability Slide

    4. Recommendation Slide

    5. Reference Slide

    Your presentation must be at least five slides in length. Slides two, three, and four must contain at least one graphic (picture, photograph, graph). Your slides must contain speaker notes. You are required to use at least three resources in your presentation, one of which must be your textbook and one must be from the CSU Online Library. Your reference slide and in-text citations must be in APA style

    TEXTBOOK: Gibson, D., & Igonor, A. (2022). Managing risk in information systems (3rd ed.). Jones & Bartlett Learning. https://online.vitalsource.com/#/books/9781284193633

    **## UnitIII2.pdf**

    SEC 4301, IS Disaster Recovery 1

    Course Learning Outcomes for Unit III

    Upon completion of this unit, students should be able to:

    2. Develop an asset ranking report.
    2.1 Process the five performance areas before evaluating the risk assessment.

    3. Analyze an impact assessment for organization threat analysis.

    3.1 Calculate which method of qualitative or quantitative that impacts critical asset(s).
    3.2 Investigate the critical steps for major components for successful risk assessment impacts.

    Required Unit Resources

    Chapter 5: Defining Risk Assessment Approaches

    Chapter 6: Performing a Risk Assessment

    Unit Lesson

    Risk Assessment Explained

    You may have seen the movie or have been fortunate to see the stage play Cabaret; if not, you may have at
    least heard the song “Money Makes the World Go Round” sung by Liza Minnelli and Joel Grey. This analogy
    is about the importance of money to businesses; if the world stopped so would the cash flow. Businesses
    must allocate money for security funding; part of that funding or budget must address risk assessments.
    Without this funding, there will be no risk assessment, and the business will be subjugated to vulnerabilities
    that will plague the business to failure. Management must provide the best balance between the profitability of
    business and the survivability of risks that can harm the business.

    According to Gibson (2015), risk assessment is risk analysis and is responsible for identifying and evaluating
    risks. The risks are prioritized by management as acknowledged in the risk management program. Below are
    brief attributes of risk assessments.

    • Time: Risk assessment is dependent on time during its creation.
    • Monitoring: Continual monitoring of the risk management program is needed.
    • Controls: Safeguards effect the risk assessment (Gibson, 2015).

    The purpose for risk assessment is to provide management the tools to evaluate and identify controls that
    support the decision-making process and to assess the effectiveness of the controls (Gibson, 2015). The
    steps below assist management in the evaluation and identification of the risk assessment.

    UNIT III STUDY GUIDE
    Risk Assessment Concepts

    SEC 4301, IS Disaster Recovery 2

    UNIT x STUDY GUIDE
    Title

    Figure 3.1: Five steps to identify risk assessment

    (Adapted from Gibson, 2015, p. 115)

    Critical Components Triad

    The above steps allow management to effectively classify the risks and control the types of threats and
    vulnerabilities encountered from these risks. There are three critical steps that help identify the major
    components that influence the successful impact of risk assessment. These steps are illustrated in Figure 3.2.

    In the previous unit, the scope was identified as a product or project within project management. Therefore,
    as a product, risk assessment scope examines what assets of the information technology infrastructure might
    be impacted by the threats and vulnerabilities. The scope could be one or more of the seven domains; that
    was covered in Unit I of this course. For instance, the System/Application Domain, as shown in Figure 3.3
    below, illustrates the scope’s boundary for the risk assessment.

    Figure 3.2: Risk Assessment Triad

    (Gibson, 2015)

    SEC 4301, IS Disaster Recovery 3

    UNIT x STUDY GUIDE
    Title

    Figure 3.4 shows the critical components that need to be identified as risk assessment impact areas for the
    scope. The products involved as shown in Figure 3.3 are firewalls, mainframe computer, and application and
    Web servers. Each of these components will need to have the single point of failure identified that is hardware
    in nature, software code attacks, and any controls associated with the hardware setup of each component.

    Figure 3.3: System/Application Domain

    (Gibson, 2015, p. 7)

    Team members from the risk assessment project must be fluent in information technology (IT) operations
    of the seven domains and are not part of the mitigating team or group that corrects the deficiencies that
    are found in the scope area. This eliminates the team members from a conflict of interest when mitigating
    the deficiencies.

    Qualitative or Quantitative Methods

    During the risk assessment process there are two methodologies of quantifying risks; these methods are
    qualitative and quantitative. Below are the differences between the two methodologies.

    • Qualitative: This involves subjective methodology and acts on categorical variables such as low,
    medium, or high, to express the possibility of risk impacts for management decision-making.
    Identifying the risk level is done through probability or impact opinion statements from experts
    (Gibson, 2015).

    • Quantitative: This objective methodology uses specific data, such as mathematical calculations, to
    arrive at a numerical decision-making process. Such formulas include single loss expectancy, annual
    loss expectancy, annual rate of occurrence, or safeguard values (Gibson, 2015).

    Challenges to Risk Assessment

    There are many challenges to risks, and rightly so, as each risk is dependent on the assessment type
    selected by management as well as the methodologies mentioned above. Such challenges are mention
    below:

    • static process technique for moving target(s),
    • data and resource availability,
    • data accuracy,
    • effects of impact through estimation, and
    • useful results that assist risk acceptance and resource allocation (Gibson, 2015).

    SEC 4301, IS Disaster Recovery 4

    UNIT x STUDY GUIDE
    Title

    Describing the Assessment

    With the understanding of risk assessment and which methodology to use, we can move forward in identifying
    the IT asset through two primary areas in classifying the systems or processes. Therefore, if we look at Figure
    3.3 System/Application Domain above, we see an application and Web server. Take the Web server for
    example; everyone in a typical organization will have access to the Web server. However, what type of
    access is granted to employees? The system administrator needs to know how the Web server operates and
    is configured in order to provide proper allocation of resources to the employees. This is important, as certain
    employees will need access to websites for purchasing equipment for the organization while others do not.
    Human resource (HR) employees will need full access rights to the organization’s employee website, but
    restricted access is given to other employees to just view their own information. Therefore, two primary
    focuses for any asset are operational characteristics and the mission of the system (Gibson, 2015).

    Identifying and Evaluating Risk Assessment

    Before performing the risk assessment, there are five performance areas that must be considered. These
    areas are illustrated in Figure 3.4 below.

    Figure 3.4: Performance Processes

    (Gibson, 2015)

    Management needs to assign ownership of the different areas of assets within the organizational IT
    infrastructure. Such ownership allows the ease of mitigating the risks when it is time to implement the risk
    recommendations to the assets (Gibson, 2015). Examples of ownership to IT assets are network devices,
    different servers (email, database, Web), user and computer management, and configuration/change
    management. The assignment of ownership will make it easier to stay within the risk assessment scope for
    the organizational assets.

    Information technology assets within an organization will depreciate over time. Therefore, it is imperative that
    critical assets be identified to be replaced since these assets will be the number one priority for risk
    management. The replacement cost or upgrade of the depreciated asset is known as asset valuation. The
    value of the asset is rated by two different viewpoints as indicated below.

    • Replacement value is the direct cost of replacing the asset in its entirety.
    • Recovery value costs involve parts that need to be replaced due to failure within the asset. Examples

    are cooling fans, hard drives, and input devices (Gibson, 2015).

    Previously, we identified threats to be any individual or software codes that can cause harm to the IT
    infrastructure to damage or endanger devices and/or people (Gibson, 2015). Consequently, identifying the

    SEC 4301, IS Disaster Recovery 5

    UNIT x STUDY GUIDE
    Title

    threats is the necessary process of the threat assessment plan. Figure 3.5 below illustrates the threat attack
    sequence in the path for loss of impact of an asset.

    Figure 3.5: Threat Cycle

    (Adapted from Gibson, 2015, p. 149)

    Reviewing the organization’s historical data as well as threat modeling will ensure all threats have been
    identified and evaluated in the risk assessment (Gibson, 2015).

    Remember, vulnerabilities are the degree to which people or systems are susceptible to impairment or
    incompatibility of IT assets as identified in Unit II. As such, all IT assets have a variety of vulnerabilities that
    can affect the operation of the asset; not all vulnerabilities can cause undue harm to the assets (Gibson,
    2015). Discovering a weakness in the IT asset is known as a vulnerability assessment. Gathering information
    about the vulnerability assessment is important. Vulnerability tools such as Retina, Nmap, and Nessus are
    used to scan the network of an organization for vulnerabilities.

    Safeguarding controls or providing security enhancements to controls are countermeasures used to prevent
    or reduce the threats and vulnerability attacks from hackers. Controls that affect the countermeasures are
    either in-place controls, meaning these controls are already part of the asset, or system or planned controls,
    which have an implementation date for those controls to be activated (Gibson, 2015). There are three types or
    categories that affect the controls that are either in-place or planned controls. These control categories are
    represented in Figure 3.6.

    SEC 4301, IS Disaster Recovery 6

    UNIT x STUDY GUIDE
    Title

    Figure 3.6: Safeguard Controls

    (Gibson, 2015)

    • Procedural controls are based on certain rules and procedures that are governed by the management
    in the organization.

    • Technical controls are automatic controls that are the highpoint for safeguarding controls by computer
    and/or software applications that protect the systems and provide constant protection.

    • Physical controls, as stated, are physical in nature including locks, gates, security guards, closed-
    circuit TV cameras, fire suppression systems, and any hardware equipment used to control the
    physical environment for the organization (Gibson, 2015).

    Summary

    Once all the risk assessments have been identified, the risk management coordinator will decide which
    methodology to implement. The choice of methods of either qualitative or quantitative, as explain earlier in
    this unit, would be used to determine the assessment needs. Again, this depends on costs of the assets. If
    you have a cost figure, then quantitative method would be used; if there is no arbitrary cost on the asset, then
    the qualitative method will be employed. Information derived from the risk assessment will then be used to
    formulate how risks are to be mitigated and to determine best practices for performing the risk assessments.

    Reference

    Gibson, D. (2015). Managing risk in information systems (2nd ed.). Jones and Bartlett Learning.

    https://online.vitalsource.com/#/books/9781284107753

    Suggested Unit Resources

    In order to access the following resources, click the links below.

    The following presentations will summarize and reinforce the information from Chapters 5 and 6 in your
    textbook.

    Chapter 5 PowerPoint Presentation
    PDF Version of Chapter 5 PowerPoint Presentation

    Chapter 6 PowerPoint Presentation
    PDF Version of Chapter 6 PowerPoint Presentation

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286817_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286816_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286820_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286819_1)

    SEC 4301, IS Disaster Recovery 7

    UNIT x STUDY GUIDE
    Title

    Learning Activities (Nongraded)

    Nongraded Learning Activities are provided to aid students in their course of study. You do not have to submit
    them. If you have questions, contact your instructor for further guidance and information.

    The following learning activities provide additional information that will assist you with the mastery of the
    learning objectives for this unit.

    Go to the CSU Online Library, and use the Discovery Search feature.

    Utilize the Discovery Search feature in the CSU Online Library, and type in the following phrases: “annual loss
    expectancy, qualitative risk, quantitative risk, risk safeguards, single point of failure, risk assessment threats.”
    Select and read two articles. Use the criteria of peer-reviewed article (scholarly) and less than five years old.
    Here is a link straight to the CSU Online Library Discovery Search.

    The internet can provide you with a wealth of information concerning the topics in this unit. For example, the
    following video is from CSU Films on Demand database and provides additional information about risk
    assessment.

    Skillbank Solutions Ltd (Producer). (1999). Risk assessment (Segment 6 of 7) [Video]. In Computer Security.

    Films on Demand.
    https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPla
    ylists.aspx?wID=273866&xtid=11727&loid=14503

    The transcript for this video can be found by clicking the “Transcript” tab to the right of the video in the Films
    on Demand database.

    Check Your Knowledge

    These questions will help you assess whether or not you have mastered the unit content. Can you answer
    them without looking in the textbook?

    • Answer the Chapter 5 Assessment questions at the end of Chapter 5 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 5 Answer Key.

    • Answer the Chapter 6 Assessment questions at the end of Chapter 6 in your textbook. After you have
    answered the questions, you can find out how well you did by viewing the Chapter 6 Answer Key.

    Word Search

    Some of this unit’s key terms and phrases (written as one word) have been hidden in the word search puzzle.
    Access the Unit III Word Search puzzle, and see if you can find them.

    [http://libguides.columbiasouthern.edu/?b=p](http://libguides.columbiasouthern.edu/?b=p)

    [https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503](https://libraryresources.columbiasouthern.edu/login?auth=CAS&url=http://fod.infobase.com/PortalPlaylists.aspx?wID=273866&xtid=11727&loid=14503)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286857_1)

    [https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1](https://online.columbiasouthern.edu/bbcswebdav/xid-145286858_1)

    – Course Learning Outcomes for Unit III
    – Required Unit Resources
    – Unit Lesson

    – Risk Assessment Explained
    – Critical Components Triad
    – Qualitative or Quantitative Methods
    – Challenges to Risk Assessment
    – Describing the Assessment
    – Identifying and Evaluating Risk Assessment
    – Summary
    – Reference

    – Suggested Unit Resources
    – Learning Activities (Nongraded)